Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Gambling-app-support@foam-q.com
Crown-Casino-media@dinnastore.com
立博官网
立博官网
Sands-Macao-support@fuji-lcak.com
Puck-break-sales@indigoblissorganics.com
网赌平台
Buy-ball-app-help@wlcbmudh.com
棋牌游戏
博天堂
博天堂
电子游戏平台
电子游戏平台
绍兴文理学院
英德东华网
来书书网
Free People中国官方网站
乐山百姓网
希奥信息
支点网
医脉通医学资讯
龟江湖
华数网通宽带网上营业厅